- Range selection
- Changing a time period in a Calendar, Organizer or Scheduler control
- Special cases
EndDate (Property) In french: DateFin
The EndDate property is used to get and change the selected time period end date: - in a Calendar control,
in an Organizer control. in a Scheduler control.
// Retrieve the selected period (Calendar control) NbDays is int NbDays = DateDifference(CAL_Calendar1.StartDate, ... CAL_Calendar1.EndDate) + 1 Info("Selected time period: from " + ... DateToString(CAL_Calendar1.StartDate) + ... " to " + DateToString(CAL_Calendar1.EndDate) + ... " which means " + NbDays + " days")
Syntax
Finding out the end date of the period Hide the details
<End date> = <Control used>.EndDate
<End date>: Character string or Date variable - End date of the period selected in the control.
- In a Calendar control, this date is in "YYYYMMDD" format.
In an Organizer or Scheduler control, this date is in "YYYYMMDDHHmmSSCCC" format.
- Date of the selected day if a day is selected,
- Empty string ("") if no day is selected.
<Control used>: Control name Name of the control used:- Calendar control,
Organizer control. Scheduler control.
Modifying the end date of the period Hide the details
<Control used>.EndDate = <New date>
<Control used>: Control name Name of the control used:- Calendar control,
Organizer control. Scheduler control.
<New date>: Character string or Date variable End date of the period to select in the control. - In a Calendar control, this date is in "YYYYMMDD" format.
In an Organizer or Scheduler control, this date is in "YYYYMMDDHHmmSSCCC" format.
Remarks Range selection To select a period : - in a Calendar control, " Range selection" must be selected in the "Details" tab.
in an Organizer control, the option "Allow time range selection" must be selected in the "Details" tab. in a Scheduler control, the option "Allow time range selection" must be selected in the "Details" tab.
Changing a time period in a Calendar, Organizer or Scheduler control To change the start date of a selected time period, specify the start date ( StartDate property) and the end date ( EndDate property). The modification of the start date: - the end date is automatically deselected.
- the end date has to be selected (programmatically or by clicking a control date).
To change the end date of a selected time period, simply use the EndDate property: the time period changes automatically. Special cases - The start date of a time period can be identified and changed with the StartDate property.
- The StartDate property returns the start date of the time period in chronological order. Therefore, if the end date was selected before the start date, the StartDate property returns the last selected date.
This page is also available for…
|
|
|
|